On-Grid Solar System
Satu produk utama berupa sistem PLTS on-grid yang dirancang, dipasang, diintegrasikan, dimonitor, dan didukung sebagai satu delivery lengkap.
Solar System Installation Types
Inverter used in this on-grid stack.
Not many separate products, but one system with complete delivery.
Panel, inverter, monitoring, O&M, dan support dokumen diposisikan sebagai bagian dari On-Grid Solar System, bukan sebagai katalog produk yang berbeda-beda.
Panel Installation
Rooftop layout, mounting structure, DC wiring, panel placement, and neat field execution.
Grid-Tie Inverter
On-grid inverter sizing and integration using the SPI3-15K-B inverter from Xiamen Kehua Digital Energy Tech Co., Ltd., plus protection devices and connection to the existing electrical panel.
Monitoring Setup
Production visibility, device status, and performance signals so operation is easier to read after handover.
Permitting Support
Technical documents, approval support, and coordination flow for a smoother activation process.
O&M Support
Preventive maintenance, performance checks, issue response, and lifecycle support after commissioning.
Capacity Planning
System recommendation based on electrical load, roof area, monthly usage, and future energy goals.
Starter capacity options for on-grid solar systems.
Paket ini membantu diskusi awal. Kapasitas final tetap disesuaikan dari tagihan, daya terpasang, kondisi atap, dan target penghematan.
On-Grid 1 kWp
Entry package for smaller loads, starter rooftops, and early energy-saving adoption.
On-Grid 2 kWp
Balanced capacity for homes or business properties with steadier daytime consumption.
On-Grid 3 kWp+
Higher-capacity setup for larger roofs, heavier usage, and stronger monthly bill reduction targets.
Why Solar
Lower Emissions
Support cleaner energy use with lower emissions and a lighter operational footprint.
Lower Energy Cost
Reduce long-term energy pressure through more efficient electricity production.
Easier Upkeep
Designed for simpler upkeep with monitoring that supports faster response.
Long-Term Value
Build a valuable energy asset for future property and business continuity.
On-Grid Flow
From deal to legal completion
Timing follows the agreed build schedule.
Prepare and submit within 3-7 days.
Allow up to 14 working days.
Allow up to 7 working days.
Allow up to 30 working days.
Allow 14-21 working days.
Allow up to 7 working days.
Allow up to 21 working days, depending on component stock.
Timing follows the agreed build schedule.
Prepare and submit within 3-7 days.
Allow up to 30 working days.
Allow up to 7 working days.
Allow up to 14 working days.
Allow 14-21 working days.
Allow up to 7 working days.
Allow up to 21 working days, depending on component stock.
Project Timeline
Scope of Work
Real rooftop installation.
A live residential layout, shown from above.