Product and Solutions

On-Grid Solar System

Satu produk utama berupa sistem PLTS on-grid yang dirancang, dipasang, diintegrasikan, dimonitor, dan didukung sebagai satu delivery lengkap.

On-grid system only Panel installation + inverter + monitoring
Interactive Solar Scene

Solar System Installation Types

Current mode
Scene phase Day solar export
Energy path Solar feeds the inverter, powers the house, and sends surplus energy back to the utility grid.
System status Net metering active · Utility export in progress
On-grid system only Open Estimator
Reference Hardware

Inverter used in this on-grid stack.

Kehua Inverter
Component Grid-Tie Inverter
Model SPI3-15K-B
Manufacturer Xiamen Kehua Digital Energy Tech Co., Ltd.
Included Scope

Not many separate products, but one system with complete delivery.

Panel, inverter, monitoring, O&M, dan support dokumen diposisikan sebagai bagian dari On-Grid Solar System, bukan sebagai katalog produk yang berbeda-beda.

01

Panel Installation

Rooftop layout, mounting structure, DC wiring, panel placement, and neat field execution.

02

Grid-Tie Inverter

On-grid inverter sizing and integration using the SPI3-15K-B inverter from Xiamen Kehua Digital Energy Tech Co., Ltd., plus protection devices and connection to the existing electrical panel.

03

Monitoring Setup

Production visibility, device status, and performance signals so operation is easier to read after handover.

04

Permitting Support

Technical documents, approval support, and coordination flow for a smoother activation process.

05

O&M Support

Preventive maintenance, performance checks, issue response, and lifecycle support after commissioning.

06

Capacity Planning

System recommendation based on electrical load, roof area, monthly usage, and future energy goals.

On-grid packages

Starter capacity options for on-grid solar systems.

Paket ini membantu diskusi awal. Kapasitas final tetap disesuaikan dari tagihan, daya terpasang, kondisi atap, dan target penghematan.

Package 1

On-Grid 1 kWp

Entry package for smaller loads, starter rooftops, and early energy-saving adoption.

Best for
RumahUMKMRukoStarter Site
Estimate this size
Package 3

On-Grid 3 kWp+

Higher-capacity setup for larger roofs, heavier usage, and stronger monthly bill reduction targets.

Best for
BisnisFasilitasKomersialScale-Up
Estimate this size

Why Solar

01

Lower Emissions

Support cleaner energy use with lower emissions and a lighter operational footprint.

02

Lower Energy Cost

Reduce long-term energy pressure through more efficient electricity production.

03

Easier Upkeep

Designed for simpler upkeep with monitoring that supports faster response.

04

Long-Term Value

Build a valuable energy asset for future property and business continuity.

On-Grid Flow

From deal to legal completion

Project Deal
Field Installation

Timing follows the agreed build schedule.

Install Report

Prepare and submit within 3-7 days.

PLN Quota Submission
ULP Verification
NIDI Submission

Allow up to 14 working days.

Provincial ESDM Result
Provincial ESDM Submission
Client BA Signature

Allow up to 7 working days.

UP3 Approval

Allow up to 30 working days.

Mandatory SLO Submission

Allow 14-21 working days.

kWh Meter Dossier

Allow up to 7 working days.

Advanced Meter Swap

Allow up to 21 working days, depending on component stock.

Legal Completion
01
Project Deal
02
Field Installation

Timing follows the agreed build schedule.

03
Install Report

Prepare and submit within 3-7 days.

04
PLN Quota Submission
05
ULP Verification
06
UP3 Approval

Allow up to 30 working days.

07
Client BA Signature

Allow up to 7 working days.

08
Provincial ESDM Submission
09
Provincial ESDM Result
10
NIDI Submission

Allow up to 14 working days.

11
Mandatory SLO Submission

Allow 14-21 working days.

12
kWh Meter Dossier

Allow up to 7 working days.

13
Advanced Meter Swap

Allow up to 21 working days, depending on component stock.

14
Legal Completion

Project Timeline

Brief
Live system
Start

Consult & survey

Align site condition, demand, and system fit.

  • Consultation
  • Survey
Prepare

Plan & approve

Set commercial structure and approval readiness.

  • Financial
  • Permitting
Deploy

Build & handover

Install under one lead, then prep the operator team.

  • EPC Contract
  • Training
Run

Monitor & maintain

Keep performance visible after activation.

  • Monitoring System
  • Operations & Management

Scope of Work

Aerial view of a residential rooftop solar installation.
Residential install

Real rooftop installation.

A live residential layout, shown from above.

Clean panel placement across active rooflines.