太阳能系统安装类型
该并网系统使用的逆变器。
不是许多分散产品,而是一套完整交付的系统。
Panel, inverter, monitoring, O&M, dan support dokumen diposisikan sebagai bagian dari On-Grid Solar System, bukan sebagai katalog produk yang berbeda-beda.
Panel Installation
Rooftop layout, mounting structure, DC wiring, panel placement, and neat field execution.
Grid-Tie Inverter
On-grid inverter sizing and integration using the SPI3-15K-B inverter from Xiamen Kehua Digital Energy Tech Co., Ltd., plus protection devices and connection to the existing electrical panel.
Monitoring Setup
Production visibility, device status, and performance signals so operation is easier to read after handover.
Permitting Support
Technical documents, approval support, and coordination flow for a smoother activation process.
O&M Support
Preventive maintenance, performance checks, issue response, and lifecycle support after commissioning.
Capacity Planning
System recommendation based on electrical load, roof area, monthly usage, and future energy goals.
适用于并网太阳能系统的起始容量选择。
Paket ini membantu diskusi awal. Kapasitas final tetap disesuaikan dari tagihan, daya terpasang, kondisi atap, dan target penghematan.
On-Grid 1 kWp
Entry package for smaller loads, starter rooftops, and early energy-saving adoption.
On-Grid 2 kWp
Balanced capacity for homes or business properties with steadier daytime consumption.
On-Grid 3 kWp+
Higher-capacity setup for larger roofs, heavier usage, and stronger monthly bill reduction targets.
光伏优势
更低排放
以更低排放与更轻的运营负担推动清洁能源使用。
更省成本
通过更高效的发电方式,降低长期能源成本压力。
维护更轻松
系统为更简洁的维护而设计,并通过监控帮助更快响应。
长期价值
为未来的物业与业务连续性建立更具价值的能源资产。
并网流程
从成交到法务完成
节奏跟随已确认的施工计划。
在 3-7 天内整理并提交。
预留最多 14 个工作日。
预留最多 7 个工作日。
预留最多 30 个工作日。
预留 14-21 个工作日。
预留最多 7 个工作日。
预留最多 21 个工作日,取决于组件库存。
节奏跟随已确认的施工计划。
在 3-7 天内整理并提交。
预留最多 30 个工作日。
预留最多 7 个工作日。
预留最多 14 个工作日。
预留 14-21 个工作日。
预留最多 7 个工作日。
预留最多 21 个工作日,取决于组件库存。
项目时间线
工作范围
真实屋顶安装。
从上方看到的住宅屋顶实际布局。